top of page

BOGIE OVERHAUL | A FLOTEC RAIL STORY

Flotec was approached by a major track maintenance company - responsible for maintaining thousands of miles of the Uks railway - to overhaul a set of hydraulic hoses on one of their bogies – the undercarriage assembly that handles braking, suspension, and traction.


An image of a fast moving train at night.

Flotec's engineer Kye Hadley, set about performing the tried and tested Hose Management Programme, examining and reporting on areas of concern, including:


  • Hose damage

  • Hose abrasion

  • Hose pressure

  • Incorrect routing

  • Excessive wear


Hadley developed an effective engineering solution, which involved replacing the faulty hoses and correctly routing their replacements to increase product efficiency, performance and prevent hose failures on essential parts.

With Flotec being an official Gates Hydraulics Distributor, Kye made sure to route and install an EN 45545 fire safe compliant market leading hose product, capable of withstanding temperatures up to 100oC and tested to 600,000 impulse cycles – making them last three times longer than alternative hose products available on the market.

Before:

A train bogie being overhauled in a railway depot.

After:

A train bogie being overhauled in a railway depot.

To find out more about Flotec’s solutions to the yellow plant on-track maintenance market, contact the technical support team on 01509 230100 or fill out the online contact form.

Download the Press Release:


 
 
 

Comments


Flotec Industrial Limited

Unit 8, Pavilion Way, Loughborough, Leicestershire LE11 5GW UK

 

what3words/// sooner.rubble.closer

 

Tel: +44 (0) 1509 230100

 

© 2026 Flotec Industrial Limited

Contact Flotec

Customer Testimonials

Company Registration Number 02968791

INNOVATION-AWARD.jpg
Union-Jack.png
  • Link to the Flotec Industrial LinkedIn Page
  • x-logo

Join the Journey.

bottom of page